+
  • AL2-1.jpg
  • AL2-2.jpg
  • AL2-3.jpg
  • AL2-4.jpg

Guangdong Mingyang Electric Co., Ltd.

Mingyang Wind Power (Phase I Intelligent Electric and Phase II Transformer) Industrial Project is located in Nanlang Town, Zhongshan City, with a steel structure area of about 85000 ㎡, a height of 19 meters, a span of 202 meters, and a total steel consumption of about 9500 tons.


Classification:


Key words:

Steel structure engineering


Product Details


Mingyang Wind Power (Phase I Intelligent Electric and Phase II Transformer) Industrial Project is located in Nanlang Town, Zhongshan City, with a steel structure area of about 85000 ㎡, a height of 19 meters, a span of 202 meters, and a total steel consumption of about 9500 tons.

 

 

The company through the internal deployment of outstanding staff external recruitment of mature design talent, the existing design staff a total of 21 people.

The company regularly organizes BIM technology and tekla deepening design training, and accumulatively trains 30 BIM and tekla deepening personnel.

More cases


Online message

If you are interested in our products, please feel free to leave a message and we will contact you as soon as possible

* Note: Please be sure to fill in the information accurately and keep the communication unblocked. We will get in touch with you as soon as possible.