steel structure
Key words:
CNOOC PR6 Pipe Gallery 4-SS2 Frame Project
The project is located in Huizhou Daya Bay Petrochemical Zone with a construction area of 30000 ㎡, a span of 20 meters, a length of 150 meters, a height of 23 meters, and a steel consumption of about 5000 tons.
Key words:
Dongguan Changping Dajingjiu Logistics Warehouse Steel Structure Project
Dongguan Changping Dajingjiu Logistics Storage Steel Structure Project is located in changping town, the largest logistics park in Dongguan, with a construction area of 32000 ㎡. The steel structure has two floors and a span of 75.5 meters, and uses about 1800 tons of steel.
Key words:
Guangzhou Junlong 5# Plant Project
The project is located in Panyu District of Guangzhou City with a construction area of 21000 ㎡, a span of 81 meters and a length of 86 meters. The second-floor interlayer roof has a total of three floors, with a height of 24.7 meters and a steel consumption of about 1750 tons.
Key words:
Foshan Huicong Home Electric City Project
The project is located in Beijiao, Shunde, Foshan City. The steel structure of the project has a construction area of 60000 ㎡, a height of 35 meters and a span of 135 meters.
Key words:
What are the requirements for fireproof coatings for steel structures?
Key words:
Company News
Industry News
Key Points and Technical Introduction of Steel Structure Construction Technology
Key words:
Company News
Industry News
Latest Products
Latest News